AU663302B2 – Building method and apparatus
– Google Patents
AU663302B2 – Building method and apparatus
– Google Patents
Building method and apparatus
Download PDF
Info
Publication number
AU663302B2
AU663302B2
AU11982/92A
AU1198292A
AU663302B2
AU 663302 B2
AU663302 B2
AU 663302B2
AU 11982/92 A
AU11982/92 A
AU 11982/92A
AU 1198292 A
AU1198292 A
AU 1198292A
AU 663302 B2
AU663302 B2
AU 663302B2
Authority
AU
Australia
Prior art keywords
container
substrate
fluid
state
arrangement
Prior art date
1991-02-12
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU11982/92A
Other versions
AU1198292A
(en
Inventor
Robert Michael Sloma
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Void Formers Ltd
Original Assignee
Void Formers Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
1991-02-12
Filing date
1992-02-10
Publication date
1995-10-05
1991-02-12
Priority claimed from GB919102946A
external-priority
patent/GB9102946D0/en
1991-03-25
Priority claimed from GB919106289A
external-priority
patent/GB9106289D0/en
1991-07-22
Priority claimed from GB919115805A
external-priority
patent/GB9115805D0/en
1992-02-10
Application filed by Void Formers Ltd
filed
Critical
Void Formers Ltd
1992-09-07
Publication of AU1198292A
publication
Critical
patent/AU1198292A/en
1993-12-02
Assigned to VOID FORMERS LIMITED
reassignment
VOID FORMERS LIMITED
Alteration of Name(s) of Applicant(s) under S113
Assignors: SLOMA, ROBERT MICHAEL
1995-10-05
Application granted
granted
Critical
1995-10-05
Publication of AU663302B2
publication
Critical
patent/AU663302B2/en
2012-02-10
Anticipated expiration
legal-status
Critical
Status
Ceased
legal-status
Critical
Current
Links
Espacenet
Global Dossier
Discuss
Classifications
E—FIXED CONSTRUCTIONS
E04—BUILDING
E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
E04G11/04—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for structures of spherical, spheroid or similar shape, or for cupola structures of circular or polygonal horizontal or vertical section; Inflatable forms
E—FIXED CONSTRUCTIONS
E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
E02D31/10—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
E—FIXED CONSTRUCTIONS
E04—BUILDING
E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
E04G11/04—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for structures of spherical, spheroid or similar shape, or for cupola structures of circular or polygonal horizontal or vertical section; Inflatable forms
E04G11/045—Inflatable forms
E—FIXED CONSTRUCTIONS
E04—BUILDING
E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
E04G11/48—Supporting structures for shutterings or frames for floors or roofs
Description
t OPI DATE 07/09/92 AOJP DATE 15/10/92 APPLN. ID 11982 92 PCT NUMBER P.T/GB92/00234 INTERNA TREATY (PCT) (51) International Patent Classification 5 (11) International Publication Number: WO 92/14004 E02D 31/10, E04G 11/48, 11/04 Al (43) International Publication Date: 20 August 1992 (20.08.92) (21) International Application Number: PCT/GB92/00234 (81) Designated States: AT (European patent), AU, BE (European patent), BF (OAPI patent), BG, BJ (OAPI patent), (22) International Filing Date: 10 February 1992 (10.02.92) BR, CA, CF (OAPI patent), CG (OAPI patent), CH (European patent), CI (OAPI patent), CM (OAPI patent), CS, DE (European patent), DK (European patent), Priority data: ES (European patent), FI, FR (European patent), GA 9102946.2 12 February 1991 (12.02.91) GB (OAPI patent), GB (European patent), GN (OAPI pa- 9106289.3 25 March 1991 (25.03.91) GB tent), GR (European patent), HU, IT (European patent), 9115805.5 22 July 1991 (22.07.91) GB JP, KP, KR, LK, LU (European patent), MC (European patent), ML (OAPI patent), MR (OAPI patent), NL (European patent), NO, PL, RO, RU, SE (European pa- Appieat-and Inventor: SLOMA, Robert,-Michaef [GB/ tent), SN (OAPI patent), TD (OAPI patent), TG (OAPI GB]; 26 Freston Gardens, Cockfosters, Hertfordshire patent), US.
EN4 9CX (GB).
(74) Agent: EDER, Ephry; E. Eder Co., 39 Cranbrook Road, Published Ilford, Essex IGI 4PA With international search report.
(54) Title: BUILDING METHOD AND APPARATUS ’22 \1 I X I I I I I I 12 J 16 1’i2 16 ‘P 12 12
A.,
14- 20’ 18 20 18 20 16 (57) Abstract A method of building a structure (22) on a substrate said method including the steps of providing on the substrate (14) a support arrangement capable of adopting a first, substantially rigid state whilst the structure (22) is being built thereabove, and a subsequent, second state permitting the accommodation of movement of, and/or forces in the substrate due to heave). The support arrangement comprises fluid confinable means (16) which, in the arrangement’s first state, confines a fluid therein to a first space and is operable (via said fluid) to support the structure (22) or at least parts thereof above the substrate (14) and which, in the arrangement’s second state, does not confine the fluid and is either in a reduced space or is readily compressible to a reduced space by said movement and/or forces. The fluid confining means may comprise a container comprising a flexible-walled main body (16) and a closure member (20) for the body, said closure member comprising, as at least part of its wall, an element degradable in a predictable manner with the intended fluid contents of the container. In a particularly preferred embodiment, the degradable element comprises a magnesium alloy to degrade in a predictable manner by the effect of water or a saline solution within the container.
L 1 1 1
A
BUILDING METHOD AND APPARATUS
DESCRIPTION
Technical Field This invention concerns methods of building structures, and arrangements for use in such methods, which are particularly advantageous when the substrate upon which the structure is to be built is liable to expansion and/or contraction.
Background Art Ground heave is a well known phenomenon, arising particularly but not exclusively in clay soils, in which the substrate expands in the event of prolonged rain following a long period without rain, or after removal of *a tree from adjacent a structure which upsets the substrate 0water balance) exerting large pressures on any structure
S..
built onto or into the substrate leading to cracking of the 0 structure foundations and walls and in the extreme to the complete failure of the structure.
Clearly it would be possible to avoid this problem by ensuring that a void is provided beneath the lowermost part of the structure as it is built into which void the r substrate may move if subject to heave without affecting the building thereabove. Such a solution is possible only if the lowermost part of the building is preformed since if it is being built “on-site” it needs to be supported at least until it is sufficiently stable to stand on its own above the substrate.
.3; Ohli -2- To overcome this problem and permit structures to be built on substrates in which heave is likely to occur it has been proposed to provide a compressible volume between the parts of the structure in contact with the substrate and the substrate itself (notably the ground beams and ground slabs used in the structure).
One such known proposal is to provide a compressible foamed plastics material expanded polystyrene) layers between the substrate upon which the structure is being built and the ground beams and ground slabs of the structure. Such a solution adds greatly to the safety of a structure, when the substrate on which it is built heaves, by reducing by partial absorption the stress transmitted to the structure. However, the compressibility of the plastics foams known to us is limited and the material always transmits a certain amount of loading to the 4 structure. As a result the thickness of the foamed X• plastics layers required are much greater than would be Or 0 needed if a complete void were provided beneath the structure (up to 2.5 times the thickness). This exacerbates another disadvantage that of the foamed plastics layer compressing under the weight of concrete as it is poured.
Another known proposal provides a sandwich support 4 4″ arrangemer t having wood or fibre boarding mounted on either em..
side of a central, fibrous paper-like honeycomb. When dry Sthe central honeycomb section of the support arrangement 3 0 will support the weight of wet concrete as it is poured, but when wet its ability so to do is considerably reduced.
Such an arrangement offers advantages over the foamed plastics layers proposal and the support need be only 0 C15mm deeper than would have been a complete void.
c”iX A disadvantage of this proposal, however, is the need to Vkeep the central honeycomb section of the arrangement dry I 1- r -m~ 3 S.2 0 *Oo 30 &*as 35 q 6
OS
SO S 5 0 4000
S
for it to retain its strength whilst it is supporting, for example, concrete being poured to form a ground beam or a reinforced concrete ground slab. Thus when using arrangements embodying this proposal it is now becoming a common requirement completely to cover the support arrangement with a water impermeable sheet e.g. polythene to prevent the central honeycomb section of the arrangement collapsing under the weight of the concrete being poured (or even, prior to the concrete being poured, by the weight of bars placed on it to reinforce the concrete) following a shower of rain or even from the effects 3f moisture in the concrete itself.
Further disadvantages of such a sandwich support arrangement are that, under certain conditions, it can (like other wood and certain cellulose products) biodegrade to form methane gas, which is dangerous (see ‘New Civil Engineer’ of 11th April 1991), and that it can harbour and promote infestation and/or dry rot.
Objects of the invention include the provision of methods of building structures and of apparatus and arrangements for use in such methods which overcome or at least alleviate the above-mentioned and/or other problems or disadvantages of the prior art.
Brief Summary of Embodiments of the Invention According to a first aspect of the invention there is provided a method of building a structure on a substrate by providing on the substrate a support arrangement capable of adopting a first, substantially rigid, supportive state whilst the structure is being built thereabove, and a subsequent, non-supportive, second state permitting the accomodation of movement of, and/or forces in, the substrate beneath the structure, said support arrangement including a rigid surface part and a plurality of container means that can confine fluid, wherein said method includes the steps of: providing the plurality of container means with fluid contents, closing the container means to confine the fluid contents therein and render the container means susbstantially rigid, positioning the said container means in mutually spaced apart relation on the substrate, arranging for the said rigid surface part to surmount the plurality of mutually spaced apart container means, the foregoing steps thereby creating, between neighbouring ones of said container means, voids between the rigid surface part and the substrate therebeneath; and wherein said method includes the further steps of: forming the structure whilst supporting it at least in part by the said support arrangement in said substantially rigid, supportive state, o and, thereafter, arranging for the container means to be collapsible to a permanently collapsed state and the fluid to be permanently expellable therefrom by heave forces acting thereon so that the support arrangement may adopt its said non-supportive, second state.
In a preferred embodiment of the aforesaid method, each S..0 said container means comprises a container that is at least partially of a degradable material and is sealed such as to maintain a pressurised, substantially rigid condition in 0.
OV: the arrangement’s first state, and the said material is “.00I allowed to degrade such that the container, after time, becomes unsealed, releasing the fluid therein, whereby the I support arrangement can adopt its second state, and the DMS~AIa: Q/ -I container can collapse and/or deform should the substrate therebelow move.
According to a second aspect of this invention there is provided a temporary support arrangement for temporarily supporting at least part of a structure during erection of the structure on a substrate, the support arrangement having a supportive, substantially rigid, first state whilst the structure is being built thereabove, and having a non-supportive, post-erection, second state in which it does not contribute to support of the structure but permits the accomodation of movement of, and/or forces in, the substrate, wherein the said temporary support arrangement comprises a rigid surface part and a plurality of container means to be mutually spaced apart and to support the rigid surface part in spaced relation above the substrate below it, and wherein each of the mutually spaced apart container means, in the arrangement’s first state, is to confine a fluid therein to a first space and contribute (via said fluid and the rigid surface part) to the support of at least part of the structure in spaced relation above the substrate and, in the arrangement’s second state, is collapsible permanently to occupy a reduced space and to permit permanent expulsion of the fluid therefrom by S.movement due to heave forces in the substrate.
It will be appreciated that if the defining wall or walls of the fluid container means is/are of resilient material, the fluid container means will collapse resiliently to occupy a reduced space in the arrangement’s second state.
Where the defining wall or walls of the fluid container means can flex but nevertheless form the fluid container means as a self-supporting container, the latter when no longer confining the fluid therein will be readily SL. 120au 06/95 6 compressible to a reduced space by said movement and/or forces.
Advantageously the container, in the arrangement’s second state, is deformable by said movement and/or forces.
Preferably the said container means are separate from the said rigid surface part and are provided on the substrate at discrete locations prior to said rigid surface part being placed thereon.
In preferred embodiments of the invention, the discretely located, fluid container means space the structure a concrete slab) above the substrate such that the entire area beneath the structure except for the aggregate of the areas occupied by the discrete fluid container means is automatically provided at the outset as a void which is able to accomodate heave of the substrate. Any heave forces tending to be transmitted to the structure via said 20 discrete fluid container means, e.g. whilst the latter are S” still in their said substantiall y rigid condition, can thus •be of a considerably reduced effect and can be reduced still further towards zero when the said condition is no longer maintained, i.e. when the arrangement is in its second state.
Each fluid container means preferably comprises, in the arrangement’s said first state, a fluid tight, fluid filled container which is sealed such as to maintain a 30 pressurised, substantially rigid condition but which is thereafter, in the arrangement’s second state, unsealed enabling it to collapse and/or deform should the substrate therebeneath move.
/J3LiAA Preferably, passage of fluid from the container means is by leakage therefrom.
S.LO t 06/95 M I w k 6a Advantageously, the fluid is confined in said container means at above atmospheric pressure.
The said at least part of the structure may comprise a ground beam or a ground slab for the structure. It will be appreciated that, by providing a said support arrangement between the said at least part of the structure and the substrate thereunder only whilst the structure is being built, expansion of the substrate (particularly if a clay substrate) may thereafter take place without deleteriously affecting the structure.
In one embodiment, each of the said container means comprises expansible means, the method being furtlher characterised in that, to initiate the arrangement’s first state, each said expansible means is expanded to lift the said rigid surface part with respect to the substrate beneath it, each said expansible means is maintained in this expanded condition whilst said structure is built and 20 at least in part supported upon the rigid surface part, and C thereafter each said expansible means is allowed to .contract to render the arrangement into its said second state and such that a void is formed between the substrate and the said at least part of the structure built thereover.
o Desirably, in another embodiment, each fluid container o means may comprise a container that is at least partially of a degradable material, the method being further Q characterised in that each container is sealed such as to maintain a pressurised, substantially rigid condition in the arrangement’s first state, and the said material is allowed to degrade such that the container, after time, becomes unsealed, releasing the fluid therein.
I,
By collapsing in this specific predictable and/or A predetermined way, the support arrangement in effect II-~ 1 i 6b 20 055555 90555* provides a void between the substrate and the structure, or at least part of a structure, built thereover.
Said container that is at least partially of a degradable material, may comprise a flexible-walled main body and a closure member for the body, said closure member comprising, as at least part thereof, a barrier element for contact by the intended fluid contents of the container and degradable by the effect of and after a generally predictable time of contact with said contents.
Advantageously the degradable element is biodegradable or electrolytically or chemically degradable.
In a particularly preferred arrangement the degradable element comprises a magnesium alloy to degrade in a predictable manner by the effect of, and after a generally predictable time of contact with, water or a saline solution within the container.
S *0 fo 0 g
P
SLM12a 69 r A 7 Preferably the building method includes the steps of locating a number of said rigid surface parts which together are operable to form shuttering for said structure in a trench in a substrate with fluid tight, fluid filled, flexible walled containers interposed between the said rigid surface parts and the bottom and side walls of the trench, the containers being maintained rigid and substantially non-deformable whilst the said structure is being built and thereafter being enabled to be collapsed and/or deformed thereby to provide a void that permits movement of the substrate without deleteriously affecting the said at least part of a building which has been built).
At least part of the fluid tight, fluid filled, flexible walled containers is degradable and will degrade after passage of time (falling within a generally predictable and/or predetermined short time span, e.g. 1 to 3 months) and after the building has been built. In this way the
C.
20 fluid within the previously pressurised container is allowed to escape and the container will collapse under the upward heave forces (and/or under the weight of the rigid part thereabove) to provide a void that permits the substrate to heave without deleteriously affecting the structure which has been built.
The shuttering arrangement for use in this last-mentioned method may comprise a number of linked rigid sheets which are locatable in a trench in a substrate to form a
S.
framework in which said structure may be built, said rigid sheets being located in said trench with fluid filled, fluid tight, flexible-walled containers interposed between
CS..
them and the walls of the trench, the containers being maintained rigid and substantially non-deformable whilst S 35 the said structure is being made and thereafter being i -AL, enabled to be collapsed and/or deformed to provide a void 111 8 that permits movement of the substrate without causing damage to the structure which has been built.
Said rigid sheets may be linked by webbing interconnecting said containers.
One preferred arrangement embodying these features comprises a plurality of containers linked by flexible pockets into which said rigid sheets may be passed to form said shuttering.
In all the above aspects of the invention the said fluid container means may be sealed (in the support arrangement’s first state) by a chemically or electrolytically or biologically degradable closure member a cap, seal or plug); the latter being such that once the structure has been built it is possible for the closure member (cap, seal or plug) to degrade, thereby unsealing the fluid container means whereby the latter no longer “conf-aes” the fluid but allows the fluid therein to escape. As a result the fluid container means can collapse and/or deform if the substrate begins to heave towards the structure.
It is envisaged that the fluid used to fill the or each container means may comprise a gas (such as air) or a, liquid (such as water), although it will be appreciated that other fluids may be used for example salt water (preferably carbonated or otherwise having a gas dissolved therein to pressurise the container).
Brief Description of the Drawings By way of example, embodiments of the invention will now be described with reference to the accompanying drawings in which:-
U
U
CW* U U. 4
US
S* S SLOMA120au3:06/P9 COMMONWEALTH OF AUSTRALIA 9 Figure 1 schematically shows a side view of a first compressible support arrangement used in a method of the invention.
Figure 2 is a schematic perspective view, to an enlarged scale, of a deformable container forming part of the support arrangement of Figure 1, Figure 3 is a schematic cross-sectional view of parts of one particular form of the container of Fig 2, Figure 4 is a schematic cross-sectional view of another particular form of the container of Fig 2, Figure 5 shows schematically at A and B side an plan views of another support arrangement embodying the invention, Figure 6 is a schematic sectional end view of shuttering in use and employing elements embodying the invention, and Figure 7 shows a modified form of the shuttering shown in Figure 6 as supplied (at A) and as used (at B).
Description of the Embodiments Figure 1 shows a support arrangement, embodying the invention, to comprise a number of planar parts 12 disposed i alongside one another. In this embodiment, the parts 12 comprise cement bonded particle boards formed by compressing and curing a mixture of cement and wood chip particles such as are sold by CP Boards Ltd of Manor i* Yard, Great Shefford, Berks, RG16 7DZ. The planar parts 12 are supported above a substrate 14 above which at least part of a structure is to be built by a number of sealed, flexible walled, containers 16 of plastics material which underlie and support edges of the planar parts 12 as shown.
End walls of each container 16 are provided with apertures 18. After the container has been filled with water (preferably salt water) or other fluid, the apertures 18 are closed by a closure member, e.g. a cap, plug or seal f 20. A slab 22 of concrete is formed on the planar elements ./2 to t 10 12 the slab being supported above the substrate by inter alia the fluid of the support arrangement.
Each fluid filled container 16 shown in Figure 1 has generally the form shown in Figure 2, that is to say it comprises a flexible walled container of plastics material with an upper wall 24 and a lower wall 26 which run generally parallel one to the other. In use the upper walls 24 support the planar elements 12 of the support airangement and the’lower walls 26 rest on the substrate 14. The distance between the walls 24 and 26 may be any desired distance, but will normally be in the range of to 150mm. The side walls 28 of the containers 16 can be parallel or can converge as they extend from the lower wall 26 to the upper wall 24 as shown. Each container may be provided of indefinite length (say 300mm to 3 metres) and may have a number of cross walls ’30 -each of which is pierced by an aperture 18 preferably spaced 300mm apart.
h20 On site, the or each planar part 12 is supported on a g predetermined array of a number of containers 16, each of S predetermined length, either directly thereon or upon a narrow bridge plate (of inverted U-shaped cross section) that extends between and rests upon a pair of containers 16. Alternatively a single, variable length container having a plurality of cross walls 30 may be cut to length on site such that two outermost cross walls 30 form end walls 32 for the container. After filling the container with water (or a chemical, e.g. salt, in water solution) or other fluid, the apertures 18 in the end walls 32 of the variable length or the fixed length containers 16 are then closed by a closure member (such as a cap, plug or seal
S.,
member) as indicated at 20. Each such closure member 20 has a wall portion that is of, or incorporates, a material 55 having a substantially predetermined degradation rate such that it will, with passage of time, and within a generally 2 predetermined or predictable short period having a AiI 1_1.
11 specific value in the range of 1 week to 3 months), degrade and thereby allow the fluid in the container to escape.
For a container of fixed length only one such cap is required.
After the concrete of the slab 24 has cured, say 4-6 weeks after it is made, the predictably-degrading plugs degrade to an extent removing their sealing effect on the containers and allowing the fluid within the container 16 to escape. Thereafter container 16 provides or acts as a void and can collapse due to the weight of the planar elements 12 (such that a further void is formed immediately beneath the slab 22 which has been built) and/or due to the upwards forces thereon from heave of the substrate 14 that is to say from the upwards rise of the substrate 14 towards the slab 22. In other words the support arrangement ensures that, if there is a movement, it will be contained within the void(s) and no damage will be done to the slab 22.
Thus the containers 16 act as substantially incompressible one**: supports for the structure as it is being built but thereafter collapse providing a void permitting clayheave or substrate movement towards the slab 22 without any deleterious effect on the slab itself or the structure thereabove.
S e The cap, plug or seal 20 can be of various forms but, in all the aforesaid arrangements co-operates with the body of 00,-0 the container to seal it such that the sealed container is substantially incompressible, the material of the container body being such that the container is by comparison readily compressible when it is unsealed.
ES C e
S
In a preferred arrangement, each container 16 is a bottle d blow-moulded of polyethylene teraphthalate (PET) plastics material to have a substantially parallelepiped form of degracaole eiement compuscs a ina rn um a nuy lu usia within the container.
i 12 12 approximate dimensions in the range 150mm X 200-300mm x 150mm and an externally-threaded neck 43 (Figs 3 and 4) leading to an open mouth, e.g. of about 50mm diameter.
Such bottles can be produced with highly flexible walls of a thickness less than 1mm yet, when filled with water and sealed by an internally-threaded closure member screwed onto the bottle’s neck and mouth, are substantially rigid and can withstand an externally applied pressure of about 515 kN/m 2 (75 lbs/in 2 without bursting or being excessively deformed.
In one simple construction (see Fig 3) the closure member comprises a plastics material screw cap which has a small diameter bore or hole 41 in its bight wall 42 and has a disc 44 of a water soluble material, e.g. sodium stearate (soap), sandwiched between that bight wall 42 and the mouth 46 of the container 16 to cover and seal the hole 41.
Alternatively, as shown in Fig 4, a cylindrical slug of the water soluble material, e.g. sodium stearate (soap), can be 2…20 wedged into the tubular bore or hole 41 (or a tubular nozzle or spout protruding axially and outwardly of the cap’s bight wall 42) so as to seal it. With either construction the water soluble material is initially sufficiently impervious as to effect sealing of the container but in a predictable or predetermined period of time, e.g. approximately 2 months, will dissolve S* sufficiently in the fluid within the bottle so as to unseal 0** from the cap and permit subsequent collapse of the 0\ container under heave forces.
In another construction, the cap’s tubular bore or hole 41 (or the tubular nozzle or spout protruding axially and outwardly of the cap’s bight wall 42) is fitted with a .i metallic insert 45 which, when exposed to fluid within the bottle or container 16, effects a chemical reaction causing .c
In a particularly preferred arrangement, each container 16 is a bottle blow-moulded of polyethylene teraphthalate (PET) plastics material to have a substantially cylindrical form of approximately 150mm diameter and a length in the range 100-300mm, its externally-threaded neck, like the neck 43 leading to an open mouth, e.g. of about diameter. As illustrated in Fig 4, the separately-provided cap for this bottle 16 is “over-sized” in that it has an outer diameter similar to that of the bottle and has an axial length corresponding substantially to the axial length of the bottle’s neck 43 whereby, when the cap is fully screwed onto the bottle, the bottle-plus-cap provides a generally cylindrical formation of substantially uniform diameter throughout its length.
20 The “over-sized” cap of this particularly preferred S””arrangement can usefully serve as a support for the bottle a S* either to contact the substrate or to contact the planar part 12 thereabove.
The cap 20 may be provided separately. If required, it can be shrink-wrapped to prevent pre-use attack by atmospheric moisture. In that case, the wrapping may be arranged such as to be automatically pierced when the cap 20 is screwed on to the container 16.
Also, with any of the aforesaid arrangements of the cap and bottle, a gas-producing water-soluble chemical compound or mixture, e.g. in a pervious sachet (optionally the same sachet containing the salt or a different one), may be 35 inserted into the or each container 16 prior to or subsequent to its being filled with water to increase the internal pressure within the container 16 to the
OIL.-
t i order of 100kN/m 2 (15psi)) so that the container is better able to support the loads thereon, e.g. due to the concrete and its associated reinforcements. For example, the gasproducing water-soluble chemical compound or mixture may be a mixture of sodium bicarbonate and tartaric acid in powder or granular form.
In yet another alternative arrangement, the degradation process may be effected by ground moisture alone and the containers 16 may be only air-filled.
It is envisaged that other chemically, biologically or electrolytically degradable devices may be provided in the closure member 20 including (but not limited to) constructions employing a molecular sieve or a sol-glass.
It will be appreciated that other variations may be made to the arrangements described. For example the containers S. need not be of the particular form shown and/or described ,0*20 above, but may be of any desired form for example they may be cuboid in shape (a plurality of containers being provided at spaced locations along the length or breadth of the planar elements as desired). Again, if the containers 0*600* S. are to support part of a structure being built on a piled foundation then they may be apertured that is to say provided as a toroidal structure through which the pile support may extend.
For example, as shown in Figs 5a and 5b, the support 30 arrangement 110 comprises rigid upper and lower planar parts 112 and 114 of, for example, cement bonded particle board. The rigid upper and lower planar parts 112 and 114 are joined by a plurality of flexible string) ties 116 each of which is firmly attached to those planar parts and is of a desired length between 50 and 100 mm).
Sandwiched between the upper and lower planar parts 112 and 114 are four flexible air tight elements 118 of natural or Ai dSL :6/R I 0t ~f au3:s r I TI Iv rL I- 16
C
20 synthetic rubber individually and separately connected by air supply tubes or lines 120 coupling the support arrangement 110 to an air supply source (for example a compressor) shown diagramatically at 122. The elements 118 may simply be positioned between the planar parts as shown or be fixed in the positions shown in any suitable way by an appropriate adhesive).
It will be appreciated that when air under pressure is supplied to the tubes or lines 120 from the source 122, the elements 118 will expand and push apart the planar parts 112 and 114 up to an amount determined by the length of the flexible ties 116.
The elements 118 which are provided between the planar parts 112 and 114 may comprise single bag formations or, preferably and as indicated in Figure 5b, be provided as toroidal or ring structures.
The upper and lower planar parts 112,114 may alternatively be of any suitable wood, fibre or plastics material and in any event, may be sized to fit standardised building elements for example ground beams in which case the planar parts will be provided as single element sheets approximately 2000 x The support arrangement 110 may be of any desired size and may readily be adapted to different site requirements by cutting the cement bonded particle boards as required making use of more or fewer elements 118 as needed. With cement bonded particle boards 8ft by 4ft (2500mm x 1250mm) in length and breadth, each element 118 contacting the planar parts 112 and 114 has an area of contact, when fully inflated, of approximately ift 2 (0.1m 2 The thickness of the cement bonded particle boards may be selected to suit site requirements from the range of thicknesses available from 6mm
S
So S 30 we Ce 0 eCO
C
C
I- III— r !Xi”OMMla’U3′:06/95
I*
17 The air lines 120 coupling the elements 118 to the air supply 122 may include suitable valving Schroder valves) enabling the air supply source 122 to be decoupled from the lines as desired.
As illustrated in Fig 5a the air supply lines 120 feed to each of the elements 118 by passing in through the side of the support arrangement 110 that is to say between the two planar parts 112 and 114. It is envisaged that the arrangement described may be modified by providing that the air supply lines pass to the elements 118 directly through the planar parts to which they are attached (for example through planar part 112 or planar part 114).
In an alternative support arrangement (not shown), the two planar parts 112,114 are significantly smaller than as shown in Figure 5, e.g. being now each approximately ift 2 0 a single flexible element between them being substantially the same as the element 118 described with 20 reference to Figure 5. In this modification the liquid supply line 120 to the flexible element 118 (that is located between and adhesively attached to the planar parts 112 and 114) extends through the uppermost planar part 112.
As before, ties 116 are provided to limit separation of the parts 112 and 114.
I
00 a 000 S 000* 00 @0 0 00 30 00* 00* 0o
I
•1 In building a structure with the support arrangements 110, the latter are provided along the ground (or substrate) and the elements 118 are then inflated by compressor 122 to enable the upper planar part 112 to provide a susbstantially rigid support, raised from the ground, for the concrete that is poured thereon to form a ground beam or ground slab).
The support given by the inflated support arrangements 110 beneath the concrete ground slab or beam is sufficient to f1
I
SL e :6/95 18 18 support the latter whilst the concrete’ cures and the structure becomes self supporting.
It will be appreciated that whilst the support arrangements 110 are maintained in their inflated state, the structure is held clear of the ground by an amount equal to the thickness (or height) of the inflated support arrangements 110.
Once the concrete of the structure has cured sufficiently for it to be self supporting, the compressor is disconnected from the air supply lines or the valve(s) in those lines are opened such that the air in the expansible means of the support arrangements 110 is released. With the reduction in air pressure the planar parts of the arrangements can move towards one another and voids can be established beneath the ground slab or beam and into which the substrate may expand without bearing upon and damaging the fabric of the structure built :20 thereon.
0p Oe…
In still another modification, the compressor 122 is omitted but the lines 120 are retained to serve as flexible fluid conduits to the elements 118. Prior to superimposing any concrete or other load upon the planar part 112, the containers 118 are filled with water or other liquid (optionally under pressure, e.g. by a soluble gas pee.
Z carbonated water being most suitable) and the tubes or lines 120 then sealed optionally by a degradable plug, 30 cap or seal. The container is thus substantially incompressible and, via the liquid therein, will support i the weight of the planar part 112 and the concrete to be poured thereon.
Once the concrete of the structure has cured, the sealed ends of the tubes may be ruptured for example cut through k, where they project through at ground level. Alternatively I- I r i. 1 -f/I 19 the degradable seal can be allowed to degrade until the fluid can emanate from the containers 118.
It will be seen that should the substrate thereafter heave the containers 118 will be compressed and their walls will deform there being no fluid pressure in the containers to maintain them in their original form and any residual fluid remaining in the containers 118 will be expelled.
Thus the containers 118 act as substantially incompressible supports for the structure as it is being built but thereafter absorb or accomodate clayheave or substrate movement towards the structure and prevent such movement having a deleterious effect on the structure thereabove.
I
a
B
x1 It will be appreciated that the lower rigid planar part 114 may be omitted in certain cases, e.g. where the substrate c contains no sharp protrusions and/or where the lower surface of the or each container 118 is protected and/or is 20 of a thicker material.
°e Figure 6 shows an embodiment of the invention in use for the formation of a ground beam 50, including reinforcing rods 52, in a trench 54. In accordance with this embodiment of the invention, planar parts 56 are provided beneath and to each side of the ground beam 50 which is being built, and these planar parts are spaced from the sides of the trench by fluid tight containers 58 and from the bottom of the trench by fluid tight containers Each container 58 and 60 may be, if desired, in substance the same as that shown in Figure 2, 3, 4 or 5 and be provided with a similar biodegradable or a similar S.chemically or electrolytically degradable cap, seal or plug. It will be appreciated that the containers 60 serve to permit the accomodation of movement of, and/or forces in, the substrate’s region below the finished beam, whereas I -I n 20 the containers 58 at the sides of the beam serve to permit the accomodation of movement of, and/or forces in, the regions of the substrate beside the finished beam.
In the arrangement of Figure 6 the side planar parts 56 may be freely supported in the trench resting against the containers 58 at the side of the trench or be fixed to those containers in any suitable way, such as for example, by means of a suitable adhesive such as Evostick.
An alternative shuttering arrangement which is shown in Figure 7 may however be used. This alternative shuttering arrangement comprises three flexible plastics pocket members 80, 82 and 84 interconnected by flexible plastics webbing parts 86. One surface of each of the pocket members 82 and 84 carries thereon has formed integrally therewith a serie of containers 88, 90 and 92 as shown.
9
S..
V The containers 88, 90 and 92 which are shown in Figure 7 :’20 simply comprise flexible walled plastics containers each in 4, S substance the same as that shown in Figure 2, 3, 4 or 5 and provided with a similar biodegradable or a similar S”chemically or electrolytically degradable cap, seal or plug. It will be appreciated that the containers 90 serve to permit the accomodation of movement of, and/or forces in, the substrate’s region below the finished beam, whereas 014 the containers 88 and 92 at the sides of the beam serve to permit the accomodation of movement of, and/or forces in, the regions of the substrate beside the finished beam.
In order to use the shuttering arrangement which is shown in Figure 7 a planar part or member 96 is placed in each of the pockets 80, 82 and 84. The shuttering arrangement is ‘I then placed in a pre-dug trench with the containers 90 on the base of the trench and the containers 88 and 92 aligned with the sides of the trench. The containers 88 and 92 are 4L1 fluid filled under pressure and then sealed.
I 21 The concrete for forming the ground beam or other structural element to be formed by the shuttering is then poured and once it has cured the biodegradable or chemically or electrolytically degradable caps, seals or plugs degrade unsealing the containers and allowing the fluid in the containers to escape and the containers to collapse.
It is thought the shuttering arrangment shown in Figure 7, provides a ready and efficacious way of speedily allowing shuttering to be provided in a trench in which a ground beam is to be formed.
In an alternative arrangement, the containers 88, 90 and 92 need not be formed integrally with the pocket members 82 and 84, but can be separate, individual containers (e.g.
as in Fig 2) located in their place.
With the arrangement shown in each of the above Figures the .,20 fluid used to fill the containers and keep them in a rigid condition whilst a structure is built thereabove may be any suitable fluid for example gas air) or liquid (e.g.
awater) or a gas-pressurised liquid carbonated water).
It is possible for the fluid which is in the containers which acts to make them rigid and the support arrangements c capable of supporting the building (or part thereof) 04 40 thereover to be provided at atmospheric pressure or at an U. overpressure if desired.
“930 Although, as described, the planar parts which are used in NO-S the various arrangements embodying the invention are of cement bonded particle board, it will be appreciated that any other suitably rigid boarding may be used for example plyboard and/or chipboard.
StOMAZOau3:O6/9 4 ,r o ap 20 rS 4 I a 04 o, C *O 0, 0*0,0 22- Applicability of Embodiments of the Invention It will be apparent that each of the above-described embodiments of the invention provides a support arrangement disposed between a substrate and at least part of a structure whilst the latter is being built, the support arrangement comprising at least one container which, whilst said at least part of the structure is being built, is filled with a fluid (either a liquid e.g. water, or a gas e.g. air, or a gas-pressurised liquid e.g. carbonated water) and sealed or otherwise closed such as to be substantially rigid and/or relatively non-compressible when pressurised by the downward load of the structure but which, after the concrete has set, is unsealed or opened such that the interior and exterior of the container are in communication with one another to provide the conditions whereby the container is comparatively deformable and/or compressible e.g. by the upward forces due to heave.
It will be appreciated that each of the above-described and/or illustrated embodiments of the invention provides a method of building a structure on a substrate and which comprises the steps of providing on the substrate a support arrangement which, whilst the structure is being built, is maintained in a rigid condition operable to support the structure or at least parts thereof above the substrate and which thereafter is not so maintained.
It is believed that the methods and arrangements above described are particularly effective in meeting the clayheave problem encountered in the building industry and in practical terms provide a void beneath a structure built on substrate likely to be effective to prevent any heave which might occur from adversely affecting the structure built thereon.
Other modifications and embodiments of the invention will be readily apparent to those skilled in this art. All such 0:a.
A
*00U 0O P 0(4
B
23 modifications and embodiments are to be deemed within the ambit and scope of the invention, and the invention is not to be deemed limited to the particular embodiment(s) hereinbefore described which may be varied in construction and detail without departing from the scope of the patent monopoly hereby sought.
a. *a*0 Q *9 a s* O d
S
SS
S.
S.
S. r
S..
S
*000 OS S
A
i
I
Claims (24)
2. A method according to Claim 1, wherein each of the said container means comprises a container that, in the arrangement’s second state, is deformable by said movement and/or forces.
3. A method according to Claim 1 or Claim 2, wherein the said container means are separate from the said rigid surface part and are provided on the substrate at discrete locations prior to said rigid surface part being placed thereon.
4. A method according to any one of Claims 1 to 3, wherein each container means comprises, in the arrangement’s said first state, a fluid tight, fluid filled container which is sealed such as to maintain a pressurised, substantially rigid condition but which is thereafter, in the arrangement’s second state, unsealed enabling it to collapse and/or deform should the substrate therebeneath move.
5. A method according to any one of Claims 1 to 4, wherein passage of fluid from the container means is by leakage therefrom.
6. A method according to any one of Claims 1 to wherein the fluid is confined in said container means at above atmospheric pressure.
7. A method according to any one of Claims 1 to 6, wherein said structure comprises a ground beam or a ground slab.
8. A method according to any one of Claims 1 to 7, “wherein each of the said container means comprises .35 expansible means, the method being further characterised in that, to attain the arrangement’s first state, each said j.j expansible means is expanded to lift the said rigid surface part with respect to the substrate beneath it, each said .Sth20kt69/94 “T 4 tOWMAI Ju C0 26 expansible means is maintained in this expanded condition whilst said structure is built and at least in part supported upon the rigid surface part, and thereafter each said expansible means is allowed to contract to render the arrangement into its said second state and such that a void is formed between the substrate and the said at least part of the structure built thereover.
9. A method according to any one of Claims 1 to 7, wherein each said container means comprises a container that is at least partially of a degradable material and is sealed such as to maintain a pressurised, substantially rigid condition in the arrangement’s first state, and wherein the said material is allowed to degrade such that the container, after time, becomes unsealed, releasing the fluid therein, whereby the support arrangement can adopt its second state, and the container can collapse and/or deform should the substrate therebelow move. e, 0
10. A method according to Claim 9, wherein each said gcontainer comprises a flexible-walled main body and a closure member for the body, said closure member comprising a barrier element having a first face in use directed to s the container’s interior for contact by the container’s fluid contents and having a second face in use directed to the exterior, said element being degradable in a predictable manner by reaction with the fluid contents of •the container. th cntinr
11. A method according to Claim 10, wherein the degradable element comprises a biodegradable or an electrolytically or chemically degradable cap, plug or seal for the container.
12. A method according to any one of Claims 9 to 11, 35 wherein, to initiate the arrangement’s first state, each .5 container is filled with a saline solution and closed by a cap member incorporating a wall element of magnesium alloy. 27
13. A method according to Claim 1 and substantially as herein described with reference to the accompanying drawings.
14. A temporary support arrangement for temporarily supporting at least part of a structure during erection of the structure on a substrate, the support arrangement having a supportive, substantially rigid, first state whilst the structure is being built thereabove, and having a non-supportive, post-erection, second state in which it does not contribute to support of the structure but permits the accomodation of movement of, and/or forces in, the substrate, wherein the said temporary support arrangement comprises a rigid surface part and a plurality of container means to be mutually spaced apart and to support the rigid surface part in spaced relation above the substrate below it, and wherein each of the mutually spaced apart 0 container means, in the arrangement’s first state, is to o•confine a fluid therein to a first space and contribute (via said fluid and the rigid surface part) to the support SSSS.* S of at least part of the structure in spaced relation above the substrate and, in the arrangement’s second state, is collapsible permanently to occupy a reduced space and to permit permanent expulsion of the fluid therefrom by movement due to heave forces in the substrate. .oo
15. A temporary support arrangement according to Claim 14, wherein the said rigid surface part comprises a layer of rigid boarding, sheeting or the like.
16. A temporary support arrangement according to Claim 14 or Claim 15, wherein the container means are arranged to leak (preferably over a substantially predetermined time) to effect transition between said first state and said second state of the support arrangement. i- 6 i I A 28 .e a 20 e 5
17. A temporary support arrangement according to any one of Claims 14 to 16, wherein said container means are susceptible to containing said fluid at above atmospheric pressure when the support arrangement is in its said first state.
18. A temporary support arrangement according to any one of Claims 14 to 17, wherein each said container means comprises expansible means, and further comprising means enabling the expansible means to expand and lift the rigid surface part with respect to the substrate whilst the structure or at least a part thereof is built upon the surface part and thereafter enabling the expansible means to contract such that a void is formed between the substrate and the said at least part of the structure built thereover.
19. A temporary support arrangement according to any one of Claims 14 to 18, comprising a further rigid surface part which is in use located on the substrate, the first- mentioned and the further rigid surface parts being substantially in register with one another and the container means being located therebetween.
20. A temporary support arrangement according to any one of Claims 14 to Claim 17, wherein each said container means comprises a container which in use, whilst the support arrangement is in its said first state, is initially sealed to prevent the container deforming, and which thereafter, whilst the suport arrangement is in its said second state, is permitted to collapse and/or deform.
21. A temporary support arrangement according to Claim wherein each said container is at least partially of a degradable material such that, after the structure has been built, the sealed container will become unsealed when the material degrades and can. then collapse, releasing the fluid therein. I II..a o Q*I 0oSo 00 0 35 0I Ll 20 p 9 S. a *I 9 a. S. S. O S 29
22. A temporary support arrangement according to Claim 21, wherein each said container comprises a flexible-walled main body and a closure member for the body, said closure member comprising, as at least part thereof, a barrier element for contact by the intended fluid contents of the container and degradable by the effect of and after a generally predictable time of contact with said contents.
23. A temporary support arrangement according to Claim 22, wherein the degradable element comprises a biodegradable or an electrolytically or chemically degradable cap, plug or seal.
24. A temporary support arrangement according to Claim 22 or Claim 23, wherein the degradable element comprises a magnesium alloy to degrade by the effect of, and after a generally predictable time of contact with, water or a saline solution within the container.
25. A temporary support arrangement for temporarily supporting at least part of a structure during erection of the structure on a substrate, the support arrangement being substantially as herein described with reference to and/or as illustrated in the accompanying drawings. DATED this Twenty-fourth: day of July 1995. VOID FORMERS LIMITED By their Patent Attorneys GRANT ADAMS COMPANY SjLOAI2~u3 /95, 1 I
AU11982/92A
1991-02-12
1992-02-10
Building method and apparatus
Ceased
AU663302B2
(en)
Applications Claiming Priority (7)
Application Number
Priority Date
Filing Date
Title
GB9102946
1991-02-12
GB919102946A
GB9102946D0
(en)
1991-02-12
1991-02-12
Building method
GB9106289
1991-03-25
GB919106289A
GB9106289D0
(en)
1991-03-25
1991-03-25
Building method
GB919115805A
GB9115805D0
(en)
1991-07-22
1991-07-22
Building method
GB9115805
1991-07-22
PCT/GB1992/000234
WO1992014004A1
(en)
1991-02-12
1992-02-10
Building method and apparatus
Publications (2)
Publication Number
Publication Date
AU1198292A
AU1198292A
(en)
1992-09-07
AU663302B2
true
AU663302B2
(en)
1995-10-05
Family
ID=27265504
Family Applications (1)
Application Number
Title
Priority Date
Filing Date
AU11982/92A
Ceased
AU663302B2
(en)
1991-02-12
1992-02-10
Building method and apparatus
Country Status (12)
Country
Link
US
(1)
US5426896A
(en)
EP
(1)
EP0573444B1
(en)
JP
(1)
JPH06504598A
(en)
KR
(1)
KR970010502B1
(en)
CN
(1)
CN1066095A
(en)
AU
(1)
AU663302B2
(en)
CA
(1)
CA2103564C
(en)
DE
(1)
DE69212819T2
(en)
GB
(1)
GB2252988B
(en)
IE
(1)
IE920443A1
(en)
IL
(1)
IL100931A
(en)
WO
(1)
WO1992014004A1
(en)
Families Citing this family (11)
* Cited by examiner, † Cited by third party
Publication number
Priority date
Publication date
Assignee
Title
US5934036A
(en)
*
1996-11-01
1999-08-10
Gallagher, Jr.; Daniel P.
Insulated concrete slab assembly
GB2325677B
(en)
*
1997-05-29
2001-09-26
Cordek Ltd
Shuttering member for use in casting a beam
GB9719343D0
(en)
*
1997-09-11
1997-11-12
Subsidence Surveys Limited
Improvements relating to foundation rafts
US20060059804A1
(en)
*
2004-08-20
2006-03-23
Brown William G
Components for use in large-scale concrete slab constructions
US7637064B2
(en)
*
2005-10-26
2009-12-29
Jessen Mark E
Building material anchor
US20070130841A1
(en)
*
2005-12-12
2007-06-14
Bays Richard V
Construction module system and method
US8011158B1
(en)
2007-04-27
2011-09-06
Sable Developing, Inc.
Footing for support of structure such as building
US8245848B2
(en)
*
2008-08-21
2012-08-21
Sacred Green, Inc.
Compostable container for storing fluids
US20160122998A1
(en)
*
2013-06-11
2016-05-05
Fabio Parodi
Formwork of reducing thickness due to loading of slab cast in-situ
EP2829690A1
(en)
*
2013-07-23
2015-01-28
Alstom Technology Ltd
Maintenance assembly adaptable within gas turbine engine
US10378222B1
(en)
*
2017-03-14
2019-08-13
Hicham Elanmati
Inflatable scaffolding
Citations (3)
* Cited by examiner, † Cited by third party
Publication number
Priority date
Publication date
Assignee
Title
FR1519752A
(en)
*
1967-02-21
1968-04-05
Formwork improvements for slabs, floors or other
US4191496A
(en)
*
1977-01-05
1980-03-04
Becker Robert F
Gas-bag supported structural foundation
US4771581A
(en)
*
1986-09-11
1988-09-20
Nill Raymond W
Fluid support system for building structures
Family Cites Families (8)
* Cited by examiner, † Cited by third party
Publication number
Priority date
Publication date
Assignee
Title
NO153019C
(en)
*
1982-03-17
1986-01-02
Norsk Hydro As
USE OF SEA WATER-SOLUBLE METALS OR THEIR FORS FOR FORCING.
GB2130524B
(en)
*
1982-04-21
1986-04-03
Magnex Ltd
Collapsible structure and method of using such a structure
GB2120167B
(en)
*
1982-04-21
1986-07-09
Beldale Investments Ltd
A deformable structure and method of using such a structure
US4624383A
(en)
*
1985-10-17
1986-11-25
Moore Roger F
Environmental building block container system
DE3611809A1
(en)
*
1986-04-08
1987-10-15
Tang Shengwei
Arrangement for protecting buildings against earthquakes
DE3814885A1
(en)
*
1988-05-02
1989-11-16
Holzmann Philipp Ag
CONTROLLABLE FLOOR PANEL OF HIGH-RISE HOUSES AND METHOD FOR THE PRODUCTION THEREOF
US4978021A
(en)
*
1990-04-04
1990-12-18
Mini Anna M
Collapsible container
US5076493A
(en)
*
1990-06-25
1991-12-31
Champion International Corporation
Tamper evident gable top carton with reclosable spout
1992
1992-02-10
WO
PCT/GB1992/000234
patent/WO1992014004A1/en
active
IP Right Grant
1992-02-10
DE
DE69212819T
patent/DE69212819T2/en
not_active
Expired – Fee Related
1992-02-10
CA
CA002103564A
patent/CA2103564C/en
not_active
Expired – Fee Related
1992-02-10
EP
EP92903910A
patent/EP0573444B1/en
not_active
Expired – Lifetime
1992-02-10
KR
KR1019930702406A
patent/KR970010502B1/en
active
IP Right Grant
1992-02-10
JP
JP4504048A
patent/JPH06504598A/en
active
Pending
1992-02-10
US
US08/098,400
patent/US5426896A/en
not_active
Expired – Fee Related
1992-02-10
AU
AU11982/92A
patent/AU663302B2/en
not_active
Ceased
1992-02-10
GB
GB9202775A
patent/GB2252988B/en
not_active
Expired – Fee Related
1992-02-11
IE
IE044392A
patent/IE920443A1/en
unknown
1992-02-12
CN
CN92100839A
patent/CN1066095A/en
active
Pending
1992-02-12
IL
IL10093192A
patent/IL100931A/en
not_active
IP Right Cessation
Patent Citations (3)
* Cited by examiner, † Cited by third party
Publication number
Priority date
Publication date
Assignee
Title
FR1519752A
(en)
*
1967-02-21
1968-04-05
Formwork improvements for slabs, floors or other
US4191496A
(en)
*
1977-01-05
1980-03-04
Becker Robert F
Gas-bag supported structural foundation
US4771581A
(en)
*
1986-09-11
1988-09-20
Nill Raymond W
Fluid support system for building structures
Also Published As
Publication number
Publication date
CA2103564A1
(en)
1992-08-13
DE69212819T2
(en)
1997-03-06
GB2252988B
(en)
1995-01-18
JPH06504598A
(en)
1994-05-26
GB9202775D0
(en)
1992-03-25
EP0573444B1
(en)
1996-08-14
KR970010502B1
(en)
1997-06-26
WO1992014004A1
(en)
1992-08-20
CN1066095A
(en)
1992-11-11
AU1198292A
(en)
1992-09-07
CA2103564C
(en)
1998-02-10
IL100931A0
(en)
1992-11-15
IL100931A
(en)
1995-06-29
DE69212819D1
(en)
1996-09-19
EP0573444A1
(en)
1993-12-15
US5426896A
(en)
1995-06-27
IE920443A1
(en)
1992-08-12
GB2252988A
(en)
1992-08-26
Similar Documents
Publication
Publication Date
Title
AU663302B2
(en)
1995-10-05
Building method and apparatus
US5172528A
(en)
1992-12-22
Building construction incorporating recycling tires
AU719969B2
(en)
2000-05-18
Yieldable mine roof support
CN101270582B
(en)
2010-09-01
Method for setting bracing column in underground cavity
US4773792A
(en)
1988-09-27
System for stabilizing structural elements
AU2003258888A1
(en)
2004-01-06
Tank for storing cryogenic fluids and method for constructing a fluid tight tank
US20010002969A1
(en)
2001-06-07
Installation for storing of natural gas
AU3103301A
(en)
2001-07-31
Soil reinforcement method and apparatus
US6718702B2
(en)
2004-04-13
Fire-resistant beams
US20080295445A1
(en)
2008-12-04
Blast Protection Structures
CA2343178A1
(en)
2000-03-16
Mine support
US6688812B2
(en)
2004-02-10
Hydraulic barrier
US3913335A
(en)
1975-10-21
Offshore terminal
GB2130524A
(en)
1984-06-06
Collapsible structure and method of using such a structure
GB2254090A
(en)
1992-09-30
Formwork for casting a beam
CA2345843C
(en)
2004-03-16
Subterranean storage vessel system
GB2329651A
(en)
1999-03-31
An inflatable foundation formwork support
Haydl et al.
2000
Design and construction errors—Case studies
EP1116829A2
(en)
2001-07-18
Foundation raft
RU2149470C1
(en)
2000-05-20
Storage for ecologically dangerous materials in seismic countries
JPS60253611A
(en)
1985-12-14
Construction work for cut-off wall
US20230286735A1
(en)
2023-09-14
An Inflatable Storage Container
GB1589871A
(en)
1981-05-20
Tank construction
JP4296542B2
(en)
2009-07-15
Backfill method
WO2010008298A1
(en)
2010-01-21
Method for casting a concrete layer, a device and a casting material for carrying out this method
Legal Events
Date
Code
Title
Description
2000-09-14
MK14
Patent ceased section 143(a) (annual fees not paid) or expired